Weekly EV Charging Report · No. 1 · Nov 8–14, 2026
The U.S. added a net 289 public charging locations and gained 508 DC fast ports in the week of Nov 8–14
We compared the Department of Energy's registry of public EV charging on the evening of Nov 7, 2026 with the copy from Nov 14, 2026. In between, 473 listings were added, 184 left the registry and 1,409 existing listings were edited. Most of the growth came from one network filing a single batch in California, and the week ended with one network in New York reporting a wave of its sites as temporarily unavailable.
00 — Key findings
- +289
Net change in listed locations, +0.34%. 417 listings arrived and stayed; 128 left for good. The median of the previous 6 weeks was +300.5. Section 02
- +180
California grew the most. +0.86%; AmpUp accounts for +159 of it. Section 04
- −4
North Carolina shrank the most. −0.20%: 11 added, 15 removed, yet DC fast ports rose +20. Section 04
- +91
New York: the distinguished change. Locations reported temporarily unavailable, 365 → 456. Section 04
- +286
Walmart added the most fast-charging ports. 56% of the week's net +508. Section 06
- 227
The biggest day was Thu Nov 12. AmpUp filed 149 of the 227 additions. Section 03
01 — What rose, what fell
9 of 12 measures rose and 2 fell. Temporarily unavailable moved fastest (+8.01%).
Fell: planned (−3) and locations with the CHAdeMO plug (−12). The sharpest move down was planned at −1.39%. In-service locations rose +154, less than the +289 in all listings, because +138 more were reported temporarily unavailable.
Percent change, Nov 7 → Nov 14
Right column: change in units
| Listed locations | 85,932 | 86,221 | +289 | +0.336% |
| In service | 83,992 | 84,146 | +154 | +0.183% |
| Temporarily unavailable | 1,724 | 1,862 | +138 | +8.005% |
| Planned | 216 | 213 | −3 | −1.389% |
| All charging ports | 271,001 | 271,784 | +783 | +0.289% |
| Level 2 ports | 188,204 | 188,479 | +275 | +0.146% |
| DC fast ports | 82,104 | 82,612 | +508 | +0.619% |
| Level 1 ports | 693 | 693 | ±0 | ±0.000% |
| Locations with DC fast charging | 16,603 | 16,664 | +61 | +0.367% |
| Locations with the NACS (Tesla) plug | 10,156 | 10,259 | +103 | +1.014% |
| Locations with the CCS plug | 13,406 | 13,457 | +51 | +0.380% |
| Locations with the CHAdeMO plug | 5,859 | 5,847 | −12 | −0.205% |
02 — The week in one equation
85,932 + 473 − 184 = 86,221. All 19 checks hold.
A daily comparison counts events, not stations. 48 records dropped out of the registry and came back under the same ID, and 8 appeared and vanished inside the week. Take those round trips out of both sides and the identity is exact: 417 arrived − 128 left = +289, the change in the count. How the checks work is on the method page.
85,932 Nov 7+ 473 added − 184 removed= 86,221 Nov 14
Every identity this report had to pass before publication
| Rows in the start copy = station count in the daily series | 85,932 | 85,932 | ✓ holds |
| Rows in the end copy = station count in the daily series | 86,221 | 86,221 | ✓ holds |
| Ports summed over the end copy = port count in the daily series | 271,784 | 271,784 | ✓ holds |
| In service + planned + temporarily unavailable = all listed locations (start) | 85,932 | 85,932 | ✓ holds |
| In-service count in the copy = daily series (start) | 83,992 | 83,992 | ✓ holds |
| In service + planned + temporarily unavailable = all listed locations (end) | 86,221 | 86,221 | ✓ holds |
| In-service count in the copy = daily series (end) | 84,146 | 84,146 | ✓ holds |
| Change in listed locations = additions − removals | 289 | 289 | ✓ holds |
| Each daily copy: change in count = additions − removals (days that fail) | 0 | 0 | ✓ holds |
| Additions = arrived and stayed + returned + came and went | 473 | 473 | ✓ holds |
| Removals = left for good + returned + came and went | 184 | 184 | ✓ holds |
| Arrived − left = change in listed locations | 289 | 289 | ✓ holds |
| State changes add up to the national change | 289 | 289 | ✓ holds |
| Each state: change = additions − removals ± listings that changed state (states that fail) | 0 | 0 | ✓ holds |
| State DC port changes add up to the national change | 508 | 508 | ✓ holds |
| Network DC port changes add up to the national change | 508 | 508 | ✓ holds |
| DC ports: on new sites − on removed sites + change at existing sites = net change | 508 | 508 | ✓ holds |
| Level 2 ports: on new sites − on removed sites + change at existing sites = net change | 275 | 275 | ✓ holds |
| This week in the weekly series = this report | 289 | 289 | ✓ holds |
03 — Day by day
Thu Nov 12 brought 227 of the week's 473 additions.
Listings arrive in batches when a network files its data. The three biggest days carried 384 additions, 81% of the week; the median day added 32.
Added and removed, each daily copy
Blue up: added · orange down: removed · Nov 7 is the baseline
| Sun Nov 8 | +19 | −17 | +2 | 126 | 1,727 |
| Mon Nov 9 | +6 | −13 | −7 | 104 | 1,760 |
| Tue Nov 10 | +56 | −29 | +27 | 202 | 1,760 |
| Wed Nov 11 | +32 | −11 | +21 | 178 | 1,744 |
| Thu Nov 12 | +227 | −46 | +181 | 189 | 1,753 |
| Fri Nov 13 | +101 | −45 | +56 | 299 | 1,774 |
| Sat Nov 14 | +32 | −23 | +9 | 311 | 1,862 |
The three biggest days
- ThuNov 12+227 −46 removed
AmpUp filed 149 of the 227 additions. Most went to California 152, Colorado 22.
- FriNov 13+101 −45 removed
Walmart filed 33 of the 101 additions. Most went to California 20, Texas 10.
- TueNov 10+56 −29 removed
ChargePoint Network filed 31 of the 56 additions. Most went to California 9, Colorado 8.
04 — Three states that stood out
California grew the most, North Carolina shrank the most, and New York is the change worth a second look.
32 states and territories grew, 11 shrank and 9 did not move. Full counts for every state are on the state pages.
Biggest increase
California
+180 locations · +0.86%
20,920 → 21,100 listed locations: 203 added and 23 removed. DC fast ports +14, all ports +150, temporarily unavailable +11.
By network, change in listed locations
Biggest moves by city: Los Angeles +93, Van Nuys +8, North Hollywood +7 and Sherman Oaks +7.
Listings added on each daily copy
Biggest decrease
North Carolina
−4 locations · −0.20%
1,954 → 1,950 listed locations: 11 added and 15 removed. DC fast ports +20, all ports +14, temporarily unavailable ±0.
By network, change in listed locations
Biggest moves by city: Durham −9, Charlotte +2, Apex +1 and Burgaw −1.
Listings added on each daily copy
Distinguished change
New York
+91 unavailable
Locations reported temporarily unavailable went from 365 to 456. Across the week, 146 status changes went to unavailable and 53 came back.
By network, change in unavailable locations
Most affected places: Latham +5, Albany +4, Annandale-On-Hudson +4 and Grand Island +4.
Unavailable locations on each daily copy
Listed locations 5,936 → 5,940 (+4), DC fast ports −4.
Why we picked it. New York barely moved in listings, but on the last copy of the week one network, Vialynk, reported sites across the state — from Albany and Troy to the Buffalo area — as temporarily unavailable at once. No other state came close to that swing. Next week's report will show whether those sites came back.
05 — Networks
AmpUp gained the most listings (+159); Walmart added the most fast ports (+286).
AmpUp went from 832 to 991 listings, +19.1% in a week.
Net change by network
Net change, Nov 7 → Nov 14; right column is listings added / removed. 2 listings switched network during the week.
06 — Fast charging
+508 DC fast ports. 81 of the 417 new listings have them.
New sites brought 543 DC fast ports and removed sites took 38 away; existing sites changed by +3. Level 2 moved the other way at existing sites (−68).
Where the +508 came from
Who added them
Net change in DC fast ports by network
Largest new fast-charging listings
| Hylo Park South - Tesla Supercharger | Las Vegas, NV | Tesla | 24 | Nov 13, 2026 |
| Grand Canyon Village Shopping Center - Tesla Supercharger | Las Vegas, NV | Tesla | 24 | Nov 13, 2026 |
| Walmart EV Charging | Roswell, GA | Walmart | 16 | Sep 22, 2026 |
| Walmart EV Charging | Lewisville, TX | Walmart | 12 | Sep 11, 2026 |
| Walmart EV Charging | Oklahoma City, OK | Walmart | 12 | Sep 10, 2026 |
| Rockville, MD Rechargery Relay - Boiling Brook Pkwy | Rockville, MD | IONNA | 12 | Nov 8, 2026 |
07 — Out of service
Temporarily unavailable locations rose from 1,724 to 1,862; Vialynk alone accounts for +98.
675 times a listing turned unavailable on a daily copy, and 508 times one came back. 1,497 locations were unavailable on all 8 copies. A network that never reports outages looks perfect here; the status is whatever each network files.
Unavailable locations, each daily copy
Peak 1,862 on Nov 14
By network, change over the week
By state
08 — Added is not opened
164 of the 417 new listings opened this week; 251 had opened earlier.
Each listing carries an opening date reported by its network. 88 of this week's new listings say they opened before 2025: the registry is catching up with them, not announcing them.
Each square ≈ 4.2 listings. 2 carry no opening date.
Who filed the new listings
New listings that stayed, by network
09 — This week against the archive
Ranked 5 of 7 weeks for net new locations and 3 of 7 for DC fast ports.
Our daily archive starts on Sep 26, 2026, so this is week 7 of the series. The median earlier week added +300.5 locations and +335.5 DC fast ports; Oct 17 was the only week the count fell (shown at zero).
Net change in listed locations
Each bar is a Sunday–Saturday week, labelled by its last day
Net change in DC fast ports
Median of the previous 6 weeks: +335.5
10 — Elsewhere
Other people tracking the same buildout.
Next
No. 2 covers Nov 15–21, 2026 and goes up on Sunday, Nov 22, 2026.
All weekly reports Nov 15–21, 2026 →
Window: 8 daily copies of the U.S. Department of Energy station list, Nov 7, 2026 → Nov 14, 2026; the last copy of each day is that day's record. Published Nov 15, 2026; this edition will not change. Method. Cite as: EVC Stations, Weekly EV Charging Report No. 1 (Nov 8–14, 2026).
Data updated 2026-11-14